Stobswood – Northumberland

February 13, 2019

Inspected in 2019, these Durakerb units were installed pre-2008. After 11 years in operation, Durakerb units look like a typical kerb, in a typical application, as is typical with all projects supplied to date.

Away from the main road, the types of loading seen here are from vehicles at slow speed especially during fixtures and events, where cars are generally parked up on the pavements across the whole stretch of road.

The kerb alignment feature and spacers ensure the kerb ends remain undamaged and the integration between pavement, kerb and roadway are maintained.

With over 400,0000 units now in use, Durakerb’s performance in varied applications is evident in all parts of the UK and Ireland.

 

 