Sapiston, Suffolk – 10 Year Inspection

This project in Sapiston, Suffolk is a typical rural application situated adjacent to a local bus terminus. Installed in 2008, the kerb lines run continuously through pedestrian/vehicle crossings and external accesses. All kerbs are pavement/asphalt backed.
All pictures within this case study show the condition in November 2018.
There is no evidence of any replacement units on site.

Recycling is driven ultimately by demand and therefore, unless we create solutions where recycled products and materials are wanted and used, then nothing will really change.
In choosing Dura products for your project, you will be improving the environment by providing a safe and useful destination for waste plastic. Companies like ours create demand, and more importantly, value for waste plastic so it is collected, controlled and re-used.

Get In Touch