BAM-Wills JV begin installation on the €241 Million Turlough to Westport Bypass

Having supplied over 4km of Duradrain in both half and full batter profiles in October, we have another 2.5km to supply in November with a further 8kms required in December and the New Year.

Duradrain was chosen primarily as a low carbon, sustainable and recyclable combined kerb and drainage system. The one depth shallow profile provided savings across site due to the reduction in  excavation and in the bed/brace construction.

For each section of works, we provided detailed hydraulic data, run schedules and points of note to ensure optimum functional performance across each and every section of CKD to outlet.

BAM Ireland & Wills Bros are equally committed to building “A better Ireland” with sustainability and responsibility to the environment clearly evident in how they design and construct. We are delighted that Duradrain was the chosen as the preferred combined kerb and drainage system for this project.