Loading...
The DuraKerb Blog2017-02-20T16:10:06+00:00

Ayr Crematorium

January 4th, 2019|Categories: Case Studies|

Ayr Crematorium & Local Infrastructure 110 units installed, equivalent to 20,020 plastic bottles, caps and closures. Greener-Safer-Simpler-Better Durakerb has been installed in three separate sections each with specific performance criteria due [...]

Worlingworth & Clare

January 4th, 2019|Categories: Case Studies|

Worlingworth & Clare, Suffolk Installed in 2008 - Inspected in November 2018 82 units installed, equivalent to 14,924 plastic bottles, caps and closures. Greener-Safer-Simpler-Better These Durakerb installations, together with a project [...]

Sapiston, Suffolk

January 3rd, 2019|Categories: Case Studies|

Sapiston, Suffolk Installed in 2008 - Inspected in November 2018 159 units installed, equivalent to 28,938 plastic bottles, caps and closures. Greener-Safer-Simpler-Better Recycling is driven ultimately by demand and therefore, unless [...]

East Midlands Airport

January 3rd, 2019|Categories: Case Studies|

East Midlands Airport Installed in 2013 - Inspected in September 2018 Over 350mtrs installed, equivalent to 69,706 plastic bottles, caps and closures. Greener-Safer-Simpler-Better Recycling is driven ultimately by demand and therefore, [...]

Llanmiloe Residential Development

November 1st, 2018|Categories: Case Studies|

Llanmiloe Residential Development This project provided the destination for 79,170 plastic bottles, caps and closures Plastic Bottles in Kerbs: Reduce – Reuse - Recycle This project and other similar developments in [...]

Durakerb in Caerphilly

October 16th, 2018|Categories: Case Studies|

Caerphilly County Borough Various urban infrastructure, supplied under Local Authorities – Wales Purchasing Agreement We have been supplying Durakerb to Caerphilly County Borough since 2008 with over 10,000 units supplied to [...]