Stobswood Northumberland

February 8th, 2019|Categories: Case Studies|

Stobswood - Northumberland 140 units installed, equivalent to 25,480 plastic bottles, caps and closures. Greener-Safer-Simpler-Better Inspected in 2019, these Durakerb units were installed pre-2008. During fixtures and events, cars are generally [...]

A191 North Silverlink Newcastle

February 8th, 2019|Categories: Case Studies|

A191, North Silverlink, Newcastle Upon Tyne 1,100 units installed, equivalent to 200,200 plastic bottles, caps and closures. Greener-Safer-Simpler-Better Installed in sections in 2017 and early 2018, Durakerb has been used along [...]

Ayr Crematorium

January 4th, 2019|Categories: Case Studies|

Ayr Crematorium & Local Infrastructure 110 units installed, equivalent to 20,020 plastic bottles, caps and closures. Greener-Safer-Simpler-Better Durakerb has been installed in three separate sections each with specific performance criteria due [...]

Worlingworth & Clare

January 4th, 2019|Categories: Case Studies|

Worlingworth & Clare, Suffolk Installed in 2008 - Inspected in November 2018 82 units installed, equivalent to 14,924 plastic bottles, caps and closures. Greener-Safer-Simpler-Better These Durakerb installations, together with a project [...]

Sapiston, Suffolk

January 3rd, 2019|Categories: Case Studies|

Sapiston, Suffolk Installed in 2008 - Inspected in November 2018 159 units installed, equivalent to 28,938 plastic bottles, caps and closures. Greener-Safer-Simpler-Better Recycling is driven ultimately by demand and therefore, unless [...]

East Midlands Airport

January 3rd, 2019|Categories: Case Studies|

East Midlands Airport Installed in 2013 - Inspected in September 2018 Over 350mtrs installed, equivalent to 69,706 plastic bottles, caps and closures. Greener-Safer-Simpler-Better Recycling is driven ultimately by demand and therefore, [...]