Sapiston, Suffolk

Sapiston, Suffolk

Installed in 2008 – Inspected in November 2018

159 units installed, equivalent to 28,938 plastic bottles, caps and closures.

Greener-Safer-Simpler-Better

Recycling is driven ultimately by demand and therefore, unless we create solutions where recycled products and materials are wanted and used, then nothing will really change.

In choosing Dura products for your project, you will be improving the environment by providing a safe and useful destination for waste plastic. Companies like ours create demand, and more importantly, value for waste plastic so it is collected, controlled and re-used.

This project in Sapiston, Suffolk is a typical rural application situated adjacent to a local bus terminus. Installed in 2008, the kerb-lines run continuously through pedestrian/vehicle crossings and external accesses. All kerbs are pavement/asphalt backed.

All pictures within this case study show the condition in November 2018.

There is no evidence of any replacements however we have asked the client for confirmation/comment.

Durakerb allows a lightweight and simple solution for kerb-side reinstatements;

Quick and simple installation for large projects and new builds considerably reduces working time in live traffic situations.