Background: 

New carriageway, gullies and drainage system to be installed within the footway. The opportunity was taken to trial DuraKerb as replacement kerbing.       

A DuraKerb Partnership With Essex County Council & May Gurney

Challenge:

Access to a very tight site where traffic disruption had to be kept to a minimum.

Solution:

DuraKerb was selected due to speed of installation and ease of delivery. “Two men laid 70 lm of DuraKerb in 2.15 hours (first time using Durakerb.” “Two pallets of DuraKerb brought to site on Transit flat back. No lifting equipment used”

“Productivity with Durakerb was found to be 3 to 4 times greater with no specialist lifting equipment needed and a reduction in traffic management costs.”